In 2019, Auburn Concrete won the contract to replace the old 3′ pipe culvert under River Road in Topsham, ME. We worked with them to design and provide a new 10′ wide precast box culvert system to be installed in its place. Our project manger worked with the engineer to create a strong and durable culvert design that will last for decades. Our production crew excelled at making the 11 21,500 lbs segments on time and to specification. Our delivery drivers got them to the site on time for the project to be completed in only one week.